Monday, September 24, 2018

Backfill for the Basement

Day 267/365
The construction on the house is coming along. Today, the backfill was added around the basement walls, some of the old sidewalk was ripped out, and we have a temporary gravel path up to the driveway (a huge improvement over the broken paving stones). Next up: the concrete floor will be poured for the basement.

No comments:

Post a Comment